Grandview Drive Reconstruction Project

Project Description

The City of Flagstaff and contractor, Eagle Mountain Construction, are working on both the utility and roadway phase of the Grandview Drive Reconstruction Project. The utility phase of this project includes the installation of new sewer and water mains and services along a section of Main Street, just south of Cedar Avenue, and along Grandview Drive from Cedar Avenue to Linda Vista Drive (including the adjacent cul-de-sacs). In addition to installing new utility infrastructure, full street reconstruction is underway; which includes new curbs, gutters and inverted asphalt pavement roadway along Grandview Drive to increase the amount of water that the road can accommodate during a flood event.

Stay informed! To receive weekly project updates, email a request to info@museumfloodprojects.com or fill out the form on the Stay Informed page!

 

Project Hotline: 928-255-5153

Construction Impacts

The contractor will work to ensure access to properties throughout the duration of the project, however, access may be closed for short durations when installing new utilities or concrete. The contractor will work with property owners and tenants on an individual basis to coordinate this work. Residential access for mail, deliveries, trash, recycling and emergency services will be maintained throughout construction. Additionally, the contractor will make every attempt to ensure continuous sewer and water service to all properties over the duration of the project; however, brief water shut-offs will be required to tie into the City’s existing system. Those affected will be notified in advance of any temporary utility interruption. Please note that residents are not advised to remove any flood mitigation measures during construction.